Change Register

New changes
0
This month
Awaiting approval
1
Under review by the change board
Ready for implementation
1
Approved by all disciplines
Rework required
1
Rejected with comments

Project Change History

5Chronological register of engineering, technical and design decisions
Period:—
CHG-2024-156Under reviewTechnical

Upgrade of the VVER-1200 reactor control and protection system

Originator: Matthew Gardner2024-12-1414:30

Implement a redundant microprocessor-based control system for reactor protection actuators with enhanced reliability classification.

CHG-2024-155ApprovedDesign

Update of primary circuit piping drawings

Originator: Laura Henderson2024-12-1311:15

Revise instrumentation impulse line routing and reactor coolant piping supports.

CHG-2024-154ImplementedOrganizationalProgress: 100%

Revision of preventive maintenance procedures

Originator: Aaron Blake2024-12-1216:45

Optimize turbine oil system and pump maintenance procedures.

CHG-2024-153RejectedTechnical

Revision of reactor trip logic

Originator: Dylan Nash2024-12-1109:20

Proposal to revise the reactor trip setpoint for reduced feedwater flow through the steam generators.

Reason for rejection: Insufficient safety justification for the proposed changes. Additional transient analysis is required.
CHG-2024-152In progressDetailed designProgress: 45%

Improved steam generator supports

Originator: Maria Hernandez2024-12-0810:00

Strengthen steam generator snubbers to withstand seismic intensity up to 8 on the project’s specified intensity scale.