Change Requests
Filters
Statistics
Total requests:178
Under assessment:23
In implementation:12
Complete:134
Rejected:9
Quick Actions
Change Request List
6| Request number | Change description | Category | Priority | Status | Originator | Submitted | Actions | |
|---|---|---|---|---|---|---|---|---|
CR-2024-045 | Reactor control and protection logic modification Revise reactor plant control logic during transients | Safety | Critical | Assessment | Robert Hayes Chief Engineer | 2024-12-12 14:30 | ||
CR-2024-044 | Steam generator pump replacement Replace reactor coolant pumps with an energy-efficient version with improved mechanical seals | Technical | High | Approved | Daniel Rodriguez Head of Construction Engineering | 2024-12-10 09:15 | ||
CR-2024-043 | Technical documentation update Update operating procedures and the unit’s safe operating conditions | Document control | Medium | Implementation | Steven Marshall Lead Engineer | 2024-12-08 11:45 | ||
CR-2024-042 | Instrumentation and control upgrade Replace analogue pressure and flow sensors with HART digital transmitters | Technical | Medium | Complete | Nathan Pierce Head of I&C | 2024-12-05 16:20 | ||
CR-2024-041 | Fuel assembly design modification Modify spacer grids in reactor core fuel assemblies | Design | Critical | Rejected | Adam Porter Reactor Physicist | 2024-12-02 13:10 | ||
CR-2024-040 | Radiation monitoring procedure update Revise the dosimetry survey plan and sampling points in the controlled area | Regulatory | Low | Submitted | Nicholas Grant Head of Radiation Protection | 2024-12-01 10:00 |
Showing 6 of 178 records
1 / 30