GBS — Geographical Breakdown Structure
GBS Structure
48- 4
- 8
- 12
- 9
- 3
- 6
- 6
- 5
- 5
- 7
- 14
- 8
- 6
| Actions | ||||
|---|---|---|---|---|
| RU.0001.156 | VVER-1200 reactor assemblyPressure-vessel-type water-cooled, water-moderated reactor, 3,200 MW(th) | TVEL JSC / AEM Technologies JSC | ||
| TH.0002.847 | PGV-1000MKP steam generator No. 1Horizontal saturated steam generator, 1,602 t/h, loop 1 | ZiO-Podolsk JSC | ||
| TH.0002.848 | PGV-1000MKP steam generator No. 2Horizontal saturated steam generator, 1,602 t/h, loop 2 | ZiO-Podolsk JSC | ||
| TH.0002.849 | PGV-1000MKP steam generator No. 3Horizontal saturated steam generator, 1,602 t/h, loop 3 | ZiO-Podolsk JSC | ||
| TH.0002.850 | PGV-1000MKP steam generator No. 4Horizontal saturated steam generator, 1,602 t/h, loop 4 | ZiO-Podolsk JSC | ||
| ME.0003.112 | GCNA-1391 reactor coolant pump No. 1Vertical centrifugal coolant circulation pump, loop 1 | CKBM JSC | ||
| ME.0003.113 | GCNA-1391 reactor coolant pump No. 2Vertical centrifugal coolant circulation pump, loop 2 | CKBM JSC | ||
| ME.0003.114 | GCNA-1391 reactor coolant pump No. 3Vertical centrifugal coolant circulation pump, loop 3 | CKBM JSC | ||
| ME.0003.115 | GCNA-1391 reactor coolant pump No. 4Vertical centrifugal coolant circulation pump, loop 4 | CKBM JSC | ||
| SF.1001.005 | First-stage ECCS accumulator No. 1Nitrogen-pressurized vessel for passive borated water injection (train 1) | Afrikantov OKBM JSC | ||
| SF.1001.007 | First-stage ECCS accumulator No. 2Nitrogen-pressurized vessel for passive borated water injection (train 2) | Afrikantov OKBM JSC | ||
| TH.0010.101 | DN 600 main steam line, loop 1Live steam piping from steam generator to turbine with thermal expansion compensation | AEM Technologies JSC |