| NR-NPP-001-TP | Nuclear plant design basis report | TP | Approved | 3 | 03A | 2024-03-12 | D. I. Smirnov | |
| NR-NPP-002-WD | Reactor Building process flow diagram | WD | Approved | 5 | 04B | 2024-04-25 | E. V. Petrova | |
| NR-NPP-003-DD | VVER-1200 reactor pressure vessel assembly drawing | DD | Under review | 2 | 02A | 2024-03-05 | M. A. Kozlov | |
| NR-NPP-004-OD | PGV-1000M steam generator operating manual | OD | Approved | 4 | 03C | 2024-01-18 | A. S. Ivanov | |
| NR-NPP-005-PE | Unit 1 construction cost estimate | PE | In development | 1 | 01A | 2024-02-21 | O. P. Sokolova | |
| NR-NPP-006-TP | Containment structural calculations | TP | Approved | 6 | 05A | 2024-05-10 | D. I. Smirnov | |
| NR-NPP-007-WD | Emergency core cooling system (ECCS) diagram | WD | Approved | 3 | 03A | 2024-06-14 | E. V. Petrova | |
| NR-NPP-008-DD | GCNA-1391 reactor coolant pump drawing | DD | Under review | 2 | 02B | 2024-04-03 | M. A. Kozlov | |
| NR-NPP-009-OD | K-1200-6.8/50 turbine installation instructions | OD | In development | 1 | 01A | 2024-05-28 | A. S. Ivanov | |
| NR-NPP-010-WD | 6 kV station auxiliary power supply diagram | WD | Approved | 4 | 03B | 2024-07-02 | A. S. Fedorov | |
| NR-NPP-011-TP | Safety Analysis Report (SAR), Chapter 15 | TP | Under review | 7 | 06A | 2024-07-19 | D. I. Smirnov | |
| NR-NPP-012-DD | KD-79 pressurizer drawing | DD | Withdrawn | 1 | 01A | 2024-01-11 | M. A. Kozlov | |
| NR-NPP-013-WD | Controlled area ventilation system diagram | WD | In development | 2 | 02A | 2024-08-08 | E. V. Petrova | |
| NR-NPP-014-OD | Operational quality assurance programme | OD | Approved | 2 | 02A | 2024-08-22 | M. V. Sidorova | |